8–12 avr. 2024
Maison MINATEC, Grenoble, FRANCE
Fuseau horaire Europe/Paris

Status of the Ce+BAF upgrade

11 avr. 2024, 09:40
20m
Maison MINATEC, Grenoble, FRANCE

Maison MINATEC, Grenoble, FRANCE

3 Parv. Louis Néel, 38054 Grenoble
Regular parallel talk WG6: Future Experiments WG6

Orateur

Yves Roblin (Jefferson Lab)

Description

Jefferson Lab is proposing to add positron beams to the 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF). A team of accelerator, physics and engineering staff have been developing the concept for the generation, production and delivery of Continuous (CW) polarized positron beams to the experimental halls, up to the full 12 GeV. A layout of the proposed concept will be shown. We will report on the ongoing efforts in the positron generation and capture, target design, beam transport and expected properties of the e+ beam on the experimental targets at 12GeV.

This project is supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177

Auteur principal

Yves Roblin (Jefferson Lab)

Documents de présentation